Link-Belt Case Studies — Real Projects, Measured Results

Equipment performance documented across construction, infrastructure, energy, and mining projects worldwide. Every metric verified by the contractor.

Interstate Bridge Construction Case Study

Interstate Highway Bridge Erection — Dallas-Fort Worth, USA

Two 300-ton Link-Belt crawler cranes deployed for a 14-month bridge girder erection program on a TxDOT Interstate Highway project. Completed 248 girder lifts with zero unplanned downtime events and zero safety incidents. Crane availability exceeded 97% across both units.

248 Lifts Completed
97% Availability
0 Safety Incidents
Metro Rail Excavation Case Study

Metro Rail Station Excavation — Sydney, Australia

Four 50-ton Link-Belt hydraulic excavators completed 380,000 m³ of earth removal for two underground station boxes. Double-shift operation over 18 months with fleet availability of 96.2%, exceeding the contractor's 93% benchmark.

380K m³ Earth Removed
96.2% Fleet Availability
18 mo Project Duration
Wind Farm Erection Case Study

Wind Turbine Erection — Alberta, Canada

Two 500-ton Link-Belt crawler cranes erected 42 wind turbines to hub height of 105 m across a remote prairie site. Nacelle weight 82 tons. Project completed 6 weeks ahead of schedule with no crane-related delays.

42 Turbines Erected
105 m Hub Height
6 Weeks Ahead of Schedule
Refinery Turnaround Case Study

Refinery Turnaround — Jubail, Saudi Arabia

200-ton telescopic crane with custom jib configuration performed 36 vessel and heat exchanger lifts during a 21-day refinery turnaround window. Single-position rigging plan saved 3 days of crane repositioning and $180,000 in project costs.

36 Heavy Lifts
$180K Saved
21 Days On-Time Completion

Have a Similar Project?

Share your project scope and our application engineers will recommend the optimal equipment configuration based on documented performance from similar deployments.