Equipment performance documented across construction, infrastructure, energy, and mining projects worldwide. Every metric verified by the contractor.
Two 300-ton Link-Belt crawler cranes deployed for a 14-month bridge girder erection program on a TxDOT Interstate Highway project. Completed 248 girder lifts with zero unplanned downtime events and zero safety incidents. Crane availability exceeded 97% across both units.
Four 50-ton Link-Belt hydraulic excavators completed 380,000 m³ of earth removal for two underground station boxes. Double-shift operation over 18 months with fleet availability of 96.2%, exceeding the contractor's 93% benchmark.
Two 500-ton Link-Belt crawler cranes erected 42 wind turbines to hub height of 105 m across a remote prairie site. Nacelle weight 82 tons. Project completed 6 weeks ahead of schedule with no crane-related delays.
200-ton telescopic crane with custom jib configuration performed 36 vessel and heat exchanger lifts during a 21-day refinery turnaround window. Single-position rigging plan saved 3 days of crane repositioning and $180,000 in project costs.
Share your project scope and our application engineers will recommend the optimal equipment configuration based on documented performance from similar deployments.
Discuss Your Project