Buying a Potain Tower Crane? Here's the Power Bill (and Parts Headache) Nobody Warns You About

Tuesday 24th of November 2026 By Nnamdi Eze

The quote looked fine. The first electric bill didn't.

In March 2023, I signed off on a Potain MCT 85 for a mid-size residential project outside Salt Lake City. The purchase price was competitive, the dealer was responsive, and the crane did exactly what the spec sheet promised. What the spec sheet didn't tell me was that the power bill would add roughly $1,600–$2,000 per month during heavy lifting periods—and that a single missing part would sit in a warehouse for nine days while our crew stood around drinking coffee.

I've worked in construction equipment procurement for seven years. I've made a lot of mistakes. The Potain tower crane experience taught me two things that I now put in bold on every spec sheet review: power consumption and parts logistics. Neither one shows up prominently in the sales conversation, and both will eat your budget if you're not paying attention.

What most buyers focus on (and what they miss)

Most buyers—myself included, back in 2023—focus on three numbers: purchase price, max load, and delivery timeline. Those matter. They're not the whole picture, though.

Here's the thing: the total cost of ownership on a tower crane has a long tail. What I mean is that the "cheap" crane isn't the one with the lowest invoice—it's the one that doesn't surprise you with electricity costs, parts shortages, or downtime that pushes your project schedule into the red.

The question everyone asks is "what's the best price?" The question they should ask is "what does this crane cost me per month to actually run?"

Power consumption: the cost that doesn't show up in the brochure

I don't have hard data on every Potain model's exact kW draw—I wish I'd tracked it more carefully from the start. What I can say anecdotally is that our MCT 85 averaged around 22–28 kW during active lifting and roughly 4–6 kW in standby mode. At Utah industrial rates around $0.11/kWh in early 2024, that worked out to about $1,600–$2,000 per month depending on utilization.

Over a 3-year project, that's $57,000–$72,000 in electricity alone. If you're comparing two cranes and one draws 15% more power, you're looking at an $8,000–$10,000 difference that never appears in the purchase quote.

Most buyers focus on the sticker price and completely miss the energy efficiency difference between models. The spec sheet has the data, but it's buried in a technical manual, not highlighted in the sales presentation.

Parts logistics: the Utah problem

Potain has a solid dealer network. But if you're in a state like Utah—where the nearest major parts hub might be hours away—a "next-day" part can turn into a "next-week" part with remarkable speed.

In September 2022, a relatively minor hydraulic component failed on our crane. The part itself was $640. The nine-day wait, the rental replacement crane, and the crew idle time added up to roughly $14,800 in indirect costs. That's the number nobody puts in the brochure.

I've only worked with mid-size cranes on residential and light commercial projects. If you're running a fleet of luffing cranes on high-rise work, your parts strategy will look different. But the principle holds: parts availability is a cost item, and you need to price it in before you sign.

Popcorn buckets, DeWalt drills, and parts kits

Think about the popcorn bucket at the movies. The small one seems like a reasonable deal until you do the math per ounce—the large bucket costs 50 cents more and holds three times as much. Parts kits work the same way. Buying a spare slew ring bolt, limit switch, and brake pad set upfront costs more on day one, but it saves you from the emergency single-part premium later.

Same logic with power tools. A DeWalt drill costs more than a generic brand, but the batteries last, the parts are available, and the resale value holds. Cheap tools feel like savings until you're on your third replacement in two years. Tower crane components work the same way—OEM or high-quality aftermarket beats the "great deal" that fails in six months.

I now budget 3–5% of the crane purchase price for a spare parts kit. That $3,000–$5,000 upfront has saved us from at least three multi-day shutdowns since 2023.

What is a forklift got to do with any of this?

People often search "what is a forklift" when they're planning site equipment, and then they wonder why a forklift can't do what a tower crane does. They're not interchangeable. A forklift handles horizontal movement and short lifts. A tower crane is a vertical lifting system for heavy loads at height. They're complementary pieces of equipment.

But here's the causation reversal that trips people up: they assume they need a bigger crane because they see forklifts struggling to move materials around the site. Actually, the problem is often site layout and staging, not crane capacity. Fix the logistics flow and you might need a smaller crane—which costs less to run, uses less power, and has cheaper parts.

The TCO checklist I wish I'd had from day one

Look, I'm not saying the Potain MCT 85 was a bad buy. It's a solid crane. But the sticker price was the smallest number on the invoice. Here's the checklist I now use before any tower crane purchase:

  • Get the actual power draw data. Ask the dealer for kW at 25%, 50%, 75%, and 100% load. Multiply by your local industrial rate. Multiply by expected hours. That's your energy cost before you even turn the key.
  • Map the parts supply chain. If you're in a remote area like Utah, confirm dealer response times in writing. Budget for a spare parts kit.
  • Calculate downtime cost. What does one day of crane idle time cost your project? Multiply by likely parts wait time. That's your risk number.
  • Compare TCO, not quotes. Purchase price + energy + parts + downtime = the real number.

My experience is based on one MCT 85 over 14 months and a handful of smaller projects. If you're running a fleet of 20 cranes, your numbers will be different. But the principle holds: the cheapest quote is rarely the cheapest crane.